Brownedge Service Reservoir

Project Details

About Project

Construction of a 3.6m diameter part brickwork part PCC chamber 7m deep over an existing 1200mm diameter welded steel pipe.

The chamber was constructed to house an Ultrasonic flow measurement instrument which was installed by WH Good Ltd as part of the phase 2 works.

The excavation was in hard rock that had to be hydraulically broken out. A mechanical shoring system was designed and installed accordingly.

 
 

Let’s Start Working Together

Please feel free to contact us. We will get back to you as soon as we receive your request. Or just call us now.